Reactive power compensation device 118.75 kVar

Client

Infleks

Project date

28. August, 2019

The reactive power compensation equipment with the aim to minimize the company's payments for the consumed reactive energy

Tasks

  • Reactive power compensation
  • Minimize the company’s payments for the consumed reactive energy
  • Perform network analysis to select suitable equipment and prepare an offer
  • Find a suitable place to install the equipment, taking into account the customer’s specifics, instructions and wishes
  • Manufacture, installation and adjustment of compensation equipment

Solutions

  • To manufacture 118.75 kvar reactive power compensation equipment
  • Taking into account the current situation in the customer’s electrical network, use ZEZ Silko standard series capacitors
  • Install a 6-stage reactive power compensation controller
  • Considering that the unit is installed outdoors, ensure appropriate climate control in the distribution and protection against precipitation

Benefits

  • The company’s payment for consumed reactive energy has been reduced to a minimum
  • At the current electricity consumption, the plant is expected to pay off in 2.5 years
  • The average monthly savings are 145 EUR

Testimonial

In August 2019, “ZTF Lāsma” developed an offer and performed the installation of a reactive power compensation equipment for the INFLEKS power supply system. At the pre-project stage, INFLEKS electricity consumption habits and statistics were analyzed and a technical offer was developed, the planned goal of which was to reduce the company's payments for the consumed reactive energy to a minimum. In the first month of operation of the equipment, a small overcompensation of inductive energy was observed, which was promptly eliminated by “ZTF Lāsma” by performing the necessary actions in the reactor power compensation equipment controller settings.

The equipment has been installed and connected to the electricity network at a high professional level and currently works flawlessly, ensuring that SIA INFLEKS currently pays only for the consumed active electricity and there is no cost for reactive energy at all. At the current electricity consumption, the plant is expected to pay off in 2.5 years.